The broken lite is out, the opening is covered and the replacement glass is a week or more away. For a property manager, that gap is where most complaints come from: a dark storefront, a tenant who cannot open the door, a board that rattles in the wind. Good temporary board-up in Las Vegas is not just plywood. It is a short plan for the days between the emergency and the install.
This guide covers how to choose the closure, what to record and how to hand it off so the permanent glass goes in without surprises.
The manager has to choose how the opening will be closed until the glass arrives.
- Plywood board-up fastened to the frame
- Clear temporary glazing such as polycarbonate, so the tenant keeps light and visibility
- Stock tempered glass if a standard size fits safely
- Board the fixed lite and keep the door working
The Record That Keeps Everyone Aligned
When the crew finishes, ask for a one-page record: which lites are covered, how the cover is fastened, what was damaged besides the glass, the measured glass size and type, and the date the replacement was ordered. Ask for photos of the opening before it was covered. This sheet is what the tenant, the insurer and the installing crew will all rely on, and it stops the “who measured this?” question later.
What it cannot tell you yet: Whether the replacement glass is in production yet, and whether the frame needs repair before the permanent glass can go in.

Choosing the Closure
| Closure | Good for | Watch for |
|---|---|---|
| Plywood | Fast, secure, cheap | Dark interior, looks closed, needs proper fastening |
| Polycarbonate or clear panel | Keeps light and a view in | Costs more, can scratch, still needs secure fastening |
| Stock tempered glass | Small standard sizes | Only if the size, type and safety requirements match |
| Door-only fix | Tenant needs entry | Door must lock and close properly |
Fasten to the Frame, Not the Glass Stops
A temporary cover is part of the assembly while it is in place. If it is screwed through the glazing stops or wedged into the pocket, it can damage parts the permanent glass needs. A good crew fastens to the frame in a way that leaves the pocket and gaskets reusable, or notes that they will need replacing.
- The frame or glazing stops were damaged when the glass broke or during board-up
- The door frame is racked and the door cannot be secured
- The opening has to stay closed so long that the tenant asks for a different storefront
- Water got behind the sill while the opening was exposed
The Las Vegas factor: wind, heat and 24-hour tenants
A board that is fine on a calm day can work loose when spring gusts or a monsoon cell sweep across the valley; the local forecast office posts wind advisories when that is likely. Check fastening after any high-wind day. In summer, a dark plywood panel facing west gets hot; that is not usually a safety issue, but it can affect the tenant’s cooling, so a clear panel may be worth the extra cost on a long wait.
A property manager has two lites broken in a break-in at a salon. The replacement tempered units are ordered. The salon needs to open the next morning. The crew boards the fixed lite, installs a clear panel in the lite beside the door so the front desk has light, and confirms the door locks. The handoff sheet records the glass sizes and the order date, and the installing crew uses it a week later without re-measuring.
Will your fastening damage the glazing stops or gaskets, and will the installing crew need new ones?
If the board-up damages parts, the permanent install needs them on the truck. Knowing now avoids a second trip and a second delay.
| What you can document | What the glazier verifies on site |
|---|---|
| Photos before and after board-up | Glass size and type for each lite |
| Which tenant is affected and their hours | Frame and stop condition |
| Insurance claim number | Fastening method and its effect on the frame |
| Any security incidents while boarded | Expected glass delivery date |
A Board-Up Handoff Sheet
Property and bay: ______
Lites covered: position, closure type
Fastened to: frame / stops / other
Glass size and type: per lite
Other damage: frame, door, hardware, sill
Order placed: date, supplier
Tenant contact: name, phone, hours
Next visit: date and task
- That stock glass used as a temporary fix meets safety glazing requirements for that location
- Insurer requirements for temporary repairs and how they are documented
- Landlord rules on what temporary closures can face the parking lot or walkway
- That temporary closures do not block a required exit
The Next Decision
The next decision is whether to keep the temporary closure as is or upgrade it while you wait. If the wait is longer than a week or the tenant is struggling, upgrade to a clear panel.
Have this ready:
- The handoff sheet
- The glass delivery date
- Tenant feedback
- Wind forecast for the week