A new tenant in a Summerlin retail center has signed the lease and wants a storefront that looks like the brand. The landlord has its own idea of what the center should look like. Summerlin storefront glass installation often turns on reconciling those two, and the evidence that settles it is small enough to hold in your hand.
This article follows a new tenant from the first sample to the release for fabrication.
The tenant has to settle the glass and frame selections the landlord will approve.
- Use the center’s standard storefront finish and glass
- Request a variation for brand reasons and wait for approval
- Keep the center standard at the frame and vary the door or display glass
- Reuse the existing storefront and change only the door
Hold the Sample Against the Building
Ask the glazier for a small glass sample in the proposed makeup and a frame finish chip. Take them outside and hold them against the neighboring bay at the time of day the center is busiest. Photograph them in sun and shade. Glass that looks clear on a spec sheet can read green or gray next to a neighbor, and a frame finish called “dark bronze” varies between suppliers. Landlords and design reviewers respond much better to a photo of the real sample than to a product name.
What it cannot tell you yet: Whether the landlord’s criteria or a community design review requires a particular product, and whether the sample product meets the energy code for the space.

What the Approval Usually Covers
- Frame finish and sight lines
- Glass tint, reflectivity and any coating
- Door type, hardware finish and handles
- Sign band and how it meets the storefront head
- Awnings or canopies attached to the front
Plan the Assembly, Not Only the Look
A new storefront has to fit the opening the landlord delivered. In newer centers the opening is often built to a standard detail; in older ones, previous tenants may have changed it. Before release, the glazier should confirm the sill condition, the head and any deflection allowance, the anchor substrate and the door location. If the tenant’s brand calls for a wider door or a centered entry where the old one was offset, the opening and possibly the slab at the threshold may change.
- The brand requires a door location or width the opening does not allow
- The landlord’s standard finish is discontinued and a substitute must be approved
- A previous tenant cut or altered the opening and it must be repaired
- Signage or awnings need structural blocking the head detail does not provide
The Summerlin factor: two jurisdictions and a planned community
Summerlin straddles jurisdictions. Much of it is within the City of Las Vegas, while Summerlin South is in unincorporated Clark County, so the building permit may go to either office. Many centers also have recorded design standards administered by the community or the landlord. Ask the tenant coordinator early which reviews apply, because a design approval can add time before the building permit.
A boutique fitness studio leases a bay in a Summerlin center. Its brand standard is black framing and clear glass; the center standard is clear anodized with a light tint. The glazier brings both samples to the site, and the photos show the black frame reading well against the neighbors. The landlord approves black framing with the center’s tinted glass, and the studio releases the order the same week.
Can you bring a sample of the actual glass makeup, not a brochure chip, before we submit for approval?
Insulated glass with a coating looks different from a single lite of the same tint. A real sample avoids approving one look and receiving another.
| What you can document | What the glazier verifies on site |
|---|---|
| Photos of the samples against the neighboring bay | Opening dimensions and condition |
| The landlord’s storefront criteria | Product availability for the approved selections |
| The brand’s storefront standard | Energy and safety glazing requirements |
| Whether the site is City of Las Vegas or Clark County | Door and hardware fit |
A Sample Scorecard for the Approval Meeting
| Item | Option A | Option B | Landlord criteria met? |
|---|---|---|---|
| Frame finish | |||
| Glass tint and reflectivity | |||
| Door style and hardware | |||
| Lead time | |||
| Energy data (SHGC, U-factor) | |||
| Cost difference |
- Glass performance values from NFRC labels or manufacturer data
- Energy code requirements for the space with the permitting office
- Safety glazing at doors and near the floor under the adopted building code
- Design review requirements with the landlord or community association
The Next Decision
The next decision is which sample set to submit for approval. Submit the one that meets the landlord criteria and has a confirmed lead time.
Have this ready:
- Sample photos in sun and shade
- The scorecard
- The landlord criteria
- Your opening date
Talk It Through
If you are opening a store in Summerlin, we can bring real samples to your site and plan the install. See our pages on storefront glass in Summerlin and storefront glass installation, or call 866-665-3975 to schedule a site visit.
Sources and Further Reading
- Summerlin (community information)
- City of Las Vegas: Building Permits
- Clark County Building & Fire Prevention
- National Fenestration Rating Council (NFRC): U-factor, SHGC and visible transmittance ratings
- Vitro Architectural Glass: glass product data and coatings
- Kawneer: storefront, entrance and framing system documents