Commercial Storefront Glass

Commercial Glass Regulations

California Commercial Glass Codes and Regulations

California has one statewide code, Title 24, updated for 2026 with new limits for commercial glass. Here is what it means for your project.

Last reviewed October 29, 2026

Home / State Regulations / California

California at a glance

TopicCalifornia
Building code2025 California Building Standards Code (Title 24), effective January 1, 2026.
Energy code2025 Energy Code (Title 24, Part 6) for permit applications on or after January 1, 2026.
New glass limitsMandatory U-factor of 0.47 for vertical glass in new nonresidential buildings, and 0.58 for replacements over 150 sq ft.
AccessibilityCalifornia Building Code Chapter 11B.
LicensingContractors State License Board (CSLB), classification C-17 Glazing.

Title 24, statewide

California adopts one set of building standards for the whole state, the California Building Standards Code (Title 24). The 2025 edition took effect January 1, 2026. Cities and counties can add local amendments, such as stricter seismic or green building rules, but they start from the same state code.

2025 Energy Code: new limits for glass

The 2025 Energy Code (Title 24, Part 6) applies to building permit applications submitted on or after January 1, 2026. For commercial glazing, the California Energy Commission summary lists a new mandatory maximum U-factor of 0.47 for vertical fenestration in new nonresidential construction (section 120.7(d)). It also lists a mandatory U-factor of 0.58 for vertical fenestration replacements over 150 square feet (section 141.0(b)1E).

The 2025 code also adds mandatory vestibules at certain public entrances that open into spaces of 3,000 square feet or more. That can change the entrance design on a larger retail or office storefront. Fenestration products also need certified performance ratings, so check the label or certificate for each product.

Accessibility: Chapter 11B

Public accommodations and commercial facilities in California must meet Chapter 11B of the California Building Code. For entrances, that covers door width and clearances, hardware type and height, opening force and thresholds. A storefront door replacement often needs an accessibility review, even when the glass itself is the only thing changing.

Licensing and local rules

The Contractors State License Board (CSLB) licenses glazing contractors under classification C-17 Glazing. Check the license on the CSLB website before signing.

Cities and counties add their own layers. Los Angeles County’s 2026 Building Code took effect January 1, 2026, and the City of Los Angeles enforces its own Building Code through LADBS. San Francisco adds bird-safe building standards through its Planning Code. Check with the local building department for any amendments.

California storefront project checklist

Before you order glass or pull a permit, confirm:

  • The 2025 Energy Code U-factor and SHGC limits, including the new mandatory U-factor maximums
  • Certified fenestration performance ratings for every product
  • Whether the entrance needs a vestibule under the 2025 Energy Code
  • Chapter 11B accessibility for doors, hardware and thresholds
  • CSLB C-17 license and any city or county amendments

Looking for glass services in California? See our California commercial storefront glass page.

FAQ

California commercial glass regulations: FAQ

It applies to building permit applications submitted on or after January 1, 2026.

Yes. The 2025 Energy Code adds a mandatory maximum U-factor of 0.47 for vertical fenestration in new nonresidential construction, and 0.58 for vertical fenestration replacements over 150 square feet.

A CSLB C-17 Glazing license, or a license class that covers the work.

Sources

Last reviewed October 29, 2026. Codes change often, and cities and counties add their own amendments. This page is general information, not legal or design advice. Confirm the rules for your project with the local building department and your design professional.

Planning a commercial glass project in California?

Tell us the address, what you are replacing or installing and your timeline. We will help you work out the next step.